SAP C-TSCM42-64 Exam Overview:
| Certification Vendor: | SAP |
|---|---|
| Exam Name: | SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 |
| Exam Number: | C-TSCM42-64 |
| Related Certifications: | SAP Certified Application Associate - Production Planning & Manufacturing (SAP ERP) SAP Certified Application Associate - SAP S/4HANA Production Planning |
| Passing Score: | 65% |
| Real Exam Qty: | 80 |
| Certificate Validity Period: | No formal expiration (legacy certification validity may vary) |
| Available Languages: | German, English |
| Exam Format: | Multiple Response, Multiple Choice, Scenario-based Questions |
| Exam Duration: | 180 minutes |
| Exam Price: | Varies by region (~USD 500) |
| Sample Questions: | ![]() |
| Exam Way: | Online proctored exam via SAP Certification Hub or authorized test centers |
| Pre Condition: | Basic knowledge of SAP ERP systems and manufacturing/production planning processes is recommended |
| Official Syllabus URL: | https://www.sap.com/training-certification.html |
SAP C-TSCM42-64 Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Demand Management and Planning | - Demand Management
|
| Integration with Other SAP Modules | - CO and SD Integration
|
| Production Orders and Execution | - Production Order Processing
|
| Enterprise Structure in Production Planning | - Organizational Units in SAP ERP
|
| Material Requirements Planning (MRP) | - Procurement Proposals
|
| Master Data for Production Planning | - Work Centers and Routings
|
| Capacity Planning and Shop Floor Control | - Capacity Requirements Planning
|
Frequently Asked Questions About SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4
The package includes 80 practice questions for the C-TSCM42-64 exam, all verified and arranged in a well-balanced mix of difficulty to support progressive study.
- Integration with Other SAP Modules ()
- Enterprise Structure in Production Planning ()
- Master Data for Production Planning ()
Let the topic weights guide how you split your study hours.
The SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 questions are spread across a well-proportioned range of difficulty, from fundamentals to challenging items. That distribution lets you build confidence session by session, and by the time the real test approaches, you have already faced everything it can reasonably throw at you.
Basic knowledge of SAP ERP systems and manufacturing/production planning processes is recommended
The C-TSCM42-64 exam contains 80 questions within 180 minutes minutes. Rehearsing under the same limit on the ExamTorrent simulator builds calm, practiced pacing.
To pass C-TSCM42-64 you need 65%, and the official exam fee is Varies by region (~USD 500). Fixing both numbers early keeps your practice target concrete.
Our service comes down to three commitments. First, the staff works around the clock online so customer demands about SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 are met the moment they arise. Second, the team is strictly discreet: customer personal information has never been leaked, and your privacy remains protected. Third, our experts watch the renewal of the question bank, and once a change is found, the updated material goes straight to your mailbox.
SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP4 Sample Questions:
Which of the following activities is necessary for the capacity availability check to be carried out automatically when a production order is released?
- A. Activate the availability check and assign an availability checking group to the material master for the product to be produced.
- B. Activate the availability check and assign an overall profile in check control for the business function order release.
- C. Activate the availability check and assign the check control to the plant.
- D. Activate the availability check and assign a checking rule to the work center for the operation to be checked.
Correct Answer: B 🗳️
Which of the following prerequisites have to be fulfilled for production orders to be transferred to a business data entry system via the Plant data collection (PP-PDC) interface? (Choose three.)
- A. The application of the PP-PDC interface was activated in the order type for the production order.
- B. Production orders have been released.
- C. The material to be produced with a production order was flagged for transfer in its material master.
- D. Execution Steps were used to record process instructions in the operation.
- E. Production orders contain at least one operation that contains a work center with a subsystem group assigned to it.
Correct Answer: A,B,E 🗳️
Which types of objects can be changed with Engineering Change Management?
(Choose three.)
- A. Task List
- B. Bill of Materials
- C. Work Center
- D. Production Version
- E. Material Master
Correct Answer: A,B,E 🗳️
A supply chain planning run is to be carried out in the SAP ECC system as an example.
What would be the most effective sequence in which to run through the planning modules?
- A. 1. Long-term planning2.Sales and Operations Planning 3. Demand management 4. Requirements planning5. Capacity planning
- B. 1. Demand management2. Sales and Operations Planning3. Capacity planning4. Long-term planning5. Requirements planning
- C. 1. Capacity planning2. Sales and OperationsPlanning 3. Demand management 4. Long-term planning5. Requirements planning
- D. 1.Sales and Operations Planning2. Demand management 3. Long-term planning 4. Requirements planning5. Capacity planning
Correct Answer: D 🗳️
From what point can you no longer use the Read PP master data in the production order?
- A. From the release of the production order.
- B. After assigning the confirmed quantity of a material component due to carrying out a material availability check.
- C. After printing the order papers.
- D. After the first posting of goods movements or confirmation.
Correct Answer: D 🗳️