Latest C_TS413_1909 Study Guides 2022 - With Test Engine PDF [Q83-Q102]

Share

Latest C_TS413_1909 Study Guides 2022 - With Test Engine PDF

Get New C_TS413_1909 Practice Test Questions Answers 


SAP S/4HANA Asset Management Certification Exam Details:

Duration180 mins
Exam CodeC_TS413_1909
Passing ScoreC_TS413_1909 - 64%
C_TS413_1809 - 60%
Reference BooksS4130 (SAP S/4HANA 1909)
S4133 (SAP S/4HANA 1909)
S4132 (SAP S/4HANA 1909)
S4131 (SAP S/4HANA 1909)
S4130 (SAP S/4HANA 1809)
S4133 (SAP S/4HANA 1809)
S4131 (SAP S/4HANA 1809)
S4132 (SAP S/4HANA 1809)
Sample QuestionsSAP S/4HANA Asset Management Certification Sample Questions
LevelAssociate
Number of Questions80
Exam Price$550 (USD)
Exam NameSAP Certified Application Associate - SAP S/4HANA Asset Management
Schedule ExamSAP Training

 

NEW QUESTION 83
Which options do you have to allow the assingment of order operation to object list entries. choose 3 answer

  • A. to all object list entries
  • B. to all task list
  • C. to all maintenance plans
  • D. only to notifiaction created via maintenance plans
  • E. to all notification

Answer: A,D,E

 

NEW QUESTION 84
Which of the following types is supported out of the box in technical objects? choose 2 answers

  • A. contractor
  • B. maintenance plant
  • C. organizational unit
  • D. controller

Answer: B,C

 

NEW QUESTION 85
Which of the following are checking instructions used to control availability checks?

  • A. Checking rules
  • B. Checking groups
  • C. Checking profiles
  • D. Checking types

Answer: A,B

 

NEW QUESTION 86
Which parameters are calcluated during shceduling of a performance-based maintenance plan? choose 2 answers

  • A. planned date based on sum of counter readings
  • B. monthly performance based on annual estimate
  • C. planned date based on cycle and daily performance
  • D. daily performance based on on annual estimate

Answer: C,D

 

NEW QUESTION 87
The starting point for the corrective maintenance process usually is a ____________.

  • A. Order
  • B. Activity
  • C. Notification
  • D. Catalog

Answer: C

 

NEW QUESTION 88
Which periode does the planner define when using the scheduling period in the maintenance plan? choose 1 answer

  • A. the period in which a shift of planned dates is allowed
  • B. the period for which the system generate planned or call dates
  • C. the period in which the system job for scheduling runs
  • D. the period for which orders are created in advance

Answer: B

 

NEW QUESTION 89
The maintenance engineer creates a singel cycle plan with the following parameters:
* the call object is maintenance order
* the indicator or seprate completion of maintenance call date is NOT set
* the indicator for completion requirement is NOT activated
* both shift factors are set to 100% .
Which date is relevant for the calculation for further planned dates for all objects? choose 1 answer

  • A. planned date of the next call number
  • B. technical completion date of the maintenance order
  • C. completion date of maintenance plan
  • D. basic finish date of the maintenance order

Answer: A

 

NEW QUESTION 90
With SAP S/4HANA embedded analytics, which tools are aimed at end users?

  • A. Design Studio
  • B. Analytical SAP Fiori applications
  • C. Query Browser
  • D. Query Designer
  • E. SAP Smart Business cockpits

Answer: B,C,E

 

NEW QUESTION 91
You create a maintenance order with header-based costing, at which level the planner display the expected costs? choose 2 answers

  • A. at the value category level
  • B. at the cost element level
  • C. at the component level
  • D. at the work center level

Answer: A,B

 

NEW QUESTION 92
Which must you define before you can create a new function location? choose 2 answers

  • A. reference functional location
  • B. status profile
  • C. functional location category
  • D. structure indicator

Answer: C,D

 

NEW QUESTION 93
During the implementation project, you need to define the organizational units. Which of the following objects can you directly assign a maintenance plant?

  • A. maintenance planner group
  • B. location
  • C. controlling area
  • D. maintenance work center

Answer: B

 

NEW QUESTION 94
Which of the following is true about SAP Asset Intelligence Network cloud application?

  • A. A constructing engineer is the typical user of this application.
  • B. It is the target of the application to maintain a global directory of pieces ofequipment, that uses general definitions.
  • C. A remote service technician is a typical user of this application.
  • D. It is the target of the application, to improve the visibility of machines.

Answer: A,B

 

NEW QUESTION 95
To which objects can you assign a budget? choose 2 answers

  • A. maintenance order
  • B. functional location
  • C. planning plant
  • D. WBS element

Answer: A,D

 

NEW QUESTION 96
What does the structure indicator define? choose 2 answers

  • A. the field selection for the functional location list
  • B. the cateogry of the functional Icoation
  • C. the allowed characters for a functional location
  • D. the hierarchy levels of the functional location structure

Answer: C,D

 

NEW QUESTION 97
what is primary goal of sap perdictive maintenence and service? choose 1 answer

  • A. to precalculate maintenance projects
  • B. to provide advanced cost controlling analysis
  • C. to create a cloud-based equipement directory
  • D. to collect and analyze machine data

Answer: A

 

NEW QUESTION 98
Which information does the usage list for equipement display? choose 1 answer

  • A. Failure frequencey
  • B. validity periods
  • C. material consumption
  • D. operation hours

Answer: B

 

NEW QUESTION 99
Which activities can a planner perfrom with the manage malfunction report SAPUI5 app? choose 3 answer

  • A. enter material
  • B. assign work to technician
  • C. enter measurement reading
  • D. print shop papers
  • E. enter effort

Answer: A,B,E

 

NEW QUESTION 100
Time Segments describe _______________ usage.

  • A. Functional Location
  • B. Orders
  • C. Notifications
  • D. Equipment

Answer: D

 

NEW QUESTION 101
What must you maintain before you create the measuring point or counters for technical objects? choose 1 answer

  • A. create a code group in the necssary catalog
  • B. create necssary characterisitics in the calssification system
  • C. assign characterisics to classes
  • D. enter an annual estimate

Answer: B

 

NEW QUESTION 102
......

C_TS413_1909 Dumps and Exam Test Engine: https://www.examtorrent.com/C_TS413_1909-valid-vce-dumps.html