To be eligible for the CT-TAE certification exam, candidates must have completed the ISTQB Foundation Level certification, which is a prerequisite. Additionally, candidates must have at least three years of experience in software testing, with a minimum of two years in test automation. Certified Tester Test Automation Engineer certification is suitable for test automation engineers, test automation architects, automation specialists, and anyone involved in test automation processes.


The CT-TAE certification is offered by the International Software Testing Qualifications Board (ISTQB), which is a non-profit organization that aims to promote software quality and testing worldwide. The ISTQB CT-TAE certification is a valuable credential for test automation engineers who are looking to enhance their knowledge and skills and advance their careers in the software testing industry.

 

NEW QUESTION # 19
Which of the following is NOT a technical design consideration for a TAA?

  • A. Availability of interfaces for the SUT to be testable
  • B. Data used by the SUT, e.g configuration, users
  • C. Standards and Legal requirements, e.g data privacy
  • D. The number of users for the SUT

Answer: D


NEW QUESTION # 20
You have been asked to implement test automation for a project that is not meeting its deadlines. After further analysis you discover that the manual testers are not able to keep up with the new feature testing because the regression testing is taking 75% of their time. As a result, the new features are being released with many defects and customers are complaining about the quality.
Given this information, what metric SHOULD you be tracking to show the value of test automation for this project?

  • A. Number of defects found by test automation.
  • B. Percentage of code covered by the test automation.
  • C. Equivalent Manual Test Effort for the automated tests.
  • D. Percentage of builds accepted/rejected by the automated tests.

Answer: C


NEW QUESTION # 21
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?

  • A. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
  • B. The ability of the SUT to prevent unauthorized access to its components or data.
  • C. The ability to identify states, outputs, intermediate result and error messages in the SUT
  • D. The ability of the SUT to perform its intended function for a specified period of time

Answer: C


NEW QUESTION # 22
What represents good practice when automating a manual regression test suite?

  • A. All existing manual tests should be decomposed into several smaller automated tests to reduce functional overlap.
  • B. Test data shared between tests should, where feasible, be stored and accessed from a single source to avoid duplication or introduction of error.
  • C. Once a manual test has been automated, execute it immediately to Identify whether it operates correctly.
  • D. Remove inter-dependencies between tests to reduce automation failures and costly error analysis.

Answer: C


NEW QUESTION # 23
Which of the following CORRECTLY describes how automation SHOULD be applied to confirmation testing?

  • A. Confirmation tests are not good candidates for automation as they are not designed to run many times
  • B. Confirmation tests should only be automated if they fail to pass on the first attempt
  • C. Confirmation tests can be automated and incorporated into an automated regression suite to show whether defects that were previously fixed reoccur
  • D. A confirmation test should only be automated after it has been run manually

Answer: C


NEW QUESTION # 24
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the 11th test. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately after the abnormal occurred when executing the 11th test?

  • A. Return the database to a consistent state that allows subsequent test to run
  • B. Re-run the test automation suite starting from the 12th test
  • C. Take a backup of the database in its current state. So It can be analyzed later
  • D. Re-run the test automation suite starting from the 1st test.

Answer: C


NEW QUESTION # 25
As a TAE you are evaluating a functional test automation tool that will be for several projects within your organization. The projects require that tool to work effectively and efficiently with SUT's in distributed environments. The test automated tool also needs to interface with other existing test tools (test management tool and defect tracking tool.) The existing test tools subject to planned updates and their interface to the test automated tool may not work property after these updates.
Which of the following are the two LEAST important concerns related to the evaluation of the test automation in this scenario?
Is the test automation tool able to launch processors and execute test cases on multiple machines in different environments?
Does the test automation tool support a licensing scheme that allows accessing different sets?
Does the test automation tool have a large feature set, but only part of the features will be sets?
Do the release notes for the planned updates on existing specify the impacts on their interfaces to other tools?
Does the test automation tool need to install specific libraries that could impact the SUT?

  • A. A and E
  • B. C and D
  • C. A and C
  • D. B and E

Answer: D


NEW QUESTION # 26
Which of the following attributes should NOT be included in a test execution report associated with a suite of automated tests?

  • A. Defect clusters identified during test execution
  • B. Environment in which the tests have been executed
  • C. System/Application under test and its version
  • D. Summary of the test execution results

Answer: A


NEW QUESTION # 27
Which of the following describes how a test execution report is likely to be used?

  • A. To measure coverage of the test basis by a test suite
  • B. To identify problematic areas of the SUT by keeping a history showing which test cases fail the most
  • C. To understand which test step caused the failure in a test case
  • D. To record how a test case failure has been fixed

Answer: B


NEW QUESTION # 28
New features have been added for the current release of a SUT.
Which action would NOT be appropriate for the TAE to perform when evaluating the impact on the TAS?

  • A. Gather feedback from the Business Analysts to determine if the current TAS will meet the needs of the new features.
  • B. Evaluate compatibility with existing test tools and, where necessary, identify alternative solutions.
  • C. Review existing keywords to see if they need to be modified.
  • D. Run existing automated tests against the updated SUT to verify and record any changes to their correct operation.

Answer: A


NEW QUESTION # 29
You are implementing a TAS for a system that has been live for over three years, using a hybrid waterfall and agile lifecycle. Live updates are made on a monthly basis.
There is no test team, with developers designing and executing unit and integration tests with some degree of automation and business analysts designing and executing manual tests at the system level. No formal test process exists, although the system has proved relatively stable for most of the time.
Unfortunately, the last two monthly releases were problematic with regression defects found in production. Your priority is the automation of functional regression tests at the system level, the budget for this has been approved by project stakeholders.
The Business Analysts have identified which test cases are most suitable for regression. You must use the organisation's long standing commercial automation tool which has passed a proof of concept in the platform for the system in question.
Which of the following suitability criteria needs the MOST attention for the TAS?

  • A. Compatibility and tool support
  • B. Technical planning in support of ROI analysis
  • C. Frequency of use.
  • D. Maturity of the test process

Answer: A


NEW QUESTION # 30
You have been asked to determine a TAS for a new release of a SUT, test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?

  • A. Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.
  • B. Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.
  • C. Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.
  • D. Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.

Answer: A


NEW QUESTION # 31
Which of the following is NOT an advantage of test automation?

  • A. The ability to run more tests in less time and therefore to make it possible to run them more often
  • B. The ability to enable a better use of skilled testers by freeing them from repetitive and boring tasks
  • C. The ability to find more defects with the same tests, compared to executing the same test manually
  • D. The ability to perform tests which would be difficult or impossible to execute manually

Answer: C


NEW QUESTION # 32
When the SUT provides insight into the behaviour of the system, providing the users the with the status of the various actions performed so that they can check that expected behaviour equals actual behaviour, what is this called?

  • A. Maintainability.
  • B. Observability.
  • C. Portability.
  • D. Controllability.

Answer: B


NEW QUESTION # 33
A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment. Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.
Which of the following would be the BEST way to automatically provides this report?

  • A. Store the execution result of the integration tests for the last build to a database (overwriting the results from the previous build), automatically create a test execution report for this build send It via e-mail to the project team
  • B. Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds), use this database to automatically update a dashboard containing the build history and test results accessible to the project team.
  • C. Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds). Automatically create a test execution report for this build and send it via e-mail to the project team
  • D. Store the code coverage results of the integration tests for the last build to a database (without overwriting the results from the previous builds). And automatically create a chart showing the trend in code coverage and send via email to the project team.

Answer: B


NEW QUESTION # 34
The Test Automation Manager has asked you to provide a solution for collecting metrics from the TAS that measures code coverage every time the automated regression test pack is run. The metrics must be trend based to ensure that the scope of the regression test pack continues to reflect enhancements made to the SUT - coverage must not drop and should ideally increase. The solution must be as automated as possible to avoid unnecessary manual overheads and errors.
Which of the following approaches would BEST meet these requirements?

  • A. The automated testware would record the pass/fail rate of each regression test case, export the data to a pre-formatted Excel spreadsheet that automatically updates a trend analysis success rate bar chart and emails it to stakeholders.
  • B. Test automation cannot measure code coverage for the SUT, only the code for the automation tools and scripts. The automated test cases would need to be run manually with a code coverage and reporting tool running in the background.
  • C. The automated testware would record overall code coverage for each run, export the data to a pre-formatted Excel spreadsheet that automatically updates a trend analysis bar chart for you to distribute to stakeholders.
  • D. The automated testware would record overall code coverage for each run and add the figure to a new row in a pre-formatted Excel spreadsheet. You would then present the spreadsheet to stakeholders so they could look for changes in coverage.

Answer: C


NEW QUESTION # 35
A TAS uses a commercial test automation tool and the default logs generated by the inconsistent formats such as different types of messages (pass/fail steps, screenshots, warnings, etc.) To solve this issue some custom logging functions have been created from the test scripts, making it possible to log the different types of messages with the same format. However, this may cause a problem due to excessive size of the logs which can make it difficult to find the required information. Assume that all the default logs will be disabled when running the automated tests and that some tests will not generate excessively sized logs.
Which of the following represents the BEST suggestion for implementing the custom logging functions?

  • A. Implement the custom logging functions to redirect the logs to multiple files
  • B. Implement the custom logging functions without saving timestamps
  • C. Implement the custom logging functions without saving stack traces
  • D. Implement the custom logging functions to support different levels of tracing

Answer: D


NEW QUESTION # 36
Which of the following statement about the implementation of automated regression testing is FALSE?

  • A. When automating regression tests, consideration should be given to how much time would be saved by automation
  • B. When automating regression tests, the initialization steps set the test preconditions should be automated wherever possible
  • C. When automating regression tests, the corresponding manual tests should have already been executed to verify they operate correctly
  • D. When automating regression tests, the structure of automated tests must always be the same as the corresponding manual tests

Answer: A


NEW QUESTION # 37
A major component of your organisation's Test Automaton Solution (TAS) is a popular open-source third-party capture-replay tool for automated functional testing.
Which two of the following must the Test Automation Engineer (TAE) ensure happens for this TAS?
a) The third party tool is placed under configuration management control.
b) The annual support and maintenance costs are agreed with the tool's vendor.
c) It is Important to obtain information about updates and new versions of the tool so that the third party tool is kept up to date.
d) Ensure that the TAS test scripts are integrated into the tool's framework.
e) Ensure that no changes are made to the tool, because modifications are not allowed for third party products.

  • A. d and e
  • B. a and b
  • C. c and d
  • D. a and c

Answer: B


NEW QUESTION # 38
......


ISTQB CT-TAE certification exam covers a wide range of topics, including test automation design, development, and maintenance. CT-TAE exam also covers the use of different test automation tools and frameworks, as well as test automation strategies, techniques, and best practices. Candidates who pass CT-TAE exam are considered experts in test automation, and they are equipped to apply their skills in real-world scenarios.

 

CT-TAE Sample Practice Exam Questions 2023 Updated Verified: https://www.examtorrent.com/CT-TAE-valid-vce-dumps.html

Exam Study Guide Free Practice Test LAST UPDATED : https://drive.google.com/open?id=1MiNzUzyqJ0WSzpSJJ94noJbQhyGwWN5T