As 2026 unfolds, ExamTorrent keeps its 640-911 promise simple — the latest version only, verified answers, 210 practice questions for the 640-911 exam, and support that treats every Cisco Introducing Cisco Data Center Networking question as worth answering.
Cisco 640-911 Exam Overview:
| Certification Vendor: | Cisco |
|---|---|
| Exam Name: | Introducing Cisco Data Center Networking (DCICN) |
| Exam Number: | 640-911 |
| Exam Duration: | 90 minutes |
| Related Certifications: | CCNP Data Center CCNA Data Center |
| Exam Price: | $250 USD |
| Exam Format: | Multiple Choice, Simulations, Drag-and-Drop |
| Passing Score: | 800-850 / 1000 |
| Available Languages: | English, Japanese |
| Real Exam Qty: | 65-75 |
| Certificate Validity Period: | 3 years |
| Recommended Training: | CCNA Data Center Official Cert Guide Introducing Cisco Data Center Networking (DCICN) v1.0 |
| Exam Registration: | Pearson VUE |
| Sample Questions: | ![]() |
| Exam Way: | Onsite testing via Pearson VUE centers; retired since April 11, 2017 |
| Pre Condition: | No formal prerequisites; basic networking knowledge recommended |
| Official Syllabus URL: | https://learningnetwork.cisco.com/s/article/ccna-data-center-dcicn-exam-overview |
Cisco 640-911 Exam Syllabus Topics:
| Section | Weight | Objectives |
|---|---|---|
| Routing Fundamentals | 52% | - Switch Virtual Interfaces and Layer 3 Switching - Static Routing and OSPF Basics - NX-OS Command Line Interface - Routing Concepts and Packet Forwarding |
| IP Addressing and Services | 12% | - IPv4 and IPv6 Addressing - Subnetting and Route Summarization - DNS, DHCP, NTP Services |
| Basic Switching Concepts | 21% | - Ethernet Technologies and MAC Operation - VLANs, Trunking and 802.1Q - VTP and STP Fundamentals |
| Data Center Physical Infrastructure | 15% | - Nexus Hardware and Licensing - Data Center Architecture and Topologies - OSI and TCP/IP Models |
640-911 Exam Details, Version Policy and Customer Perks
- IP Addressing and Services (12%)
- Basic Switching Concepts (21%)
- Routing Fundamentals (52%)
Cisco Introducing Cisco Data Center Networking Sample Questions:
What is the correct format of an access control list on a Cisco Nexus switch to deny FTP traffic from any source to destination host 10.10.1.110?
- A. N5K-A(config)#access-list 101deny tcp any host 10.10.1.110 eq ftp
- B. N5K-A(config)# ip access-list 101N5K-A(config-acl)# deny tcp any host 10.10.1.110 eq 21N5K-A(config-acl)# permit ip any any
- C. N5K-A(config)# ip access-list 101N5K-A(config-acl)# denyudp any host 10.10.1.110 eq 21N5K-A(config-acl)# permit ip any any
- D. N5K-A(config)#access-list 101deny tcp any host 10.10.1.110 eq ftpN5KA(config)#access-list 101denyip any any
- E. N5K-A(config)# ip access-list 101N5K-A(config-acl)# deny tcp any host 10.10.1.110 eq ftp
Correct Answer: B 🗳️
Refer to the exhibit.
Which two statements describe two characteristics of this design? (Choose two.)
- A. A single cable failure will bring down the entire network.
- B. The network is a physical tree topology.
- C. A single cable failure will not bring down the entire network.
- D. The network is a physical point-to-multipoint topology.
- E. The network is a physical mesh topology.
Correct Answer: C,D 🗳️
What is the binary value of the hexadecimal number 0x511?
- A. 10100110011
- B. 10100010001
- C. 10110010001
- D. 10100011001
- E. 10101010101
Correct Answer: B 🗳️
Explanation: Only visible for ExamTorrent members. You can sign-up / login (it's free).
What is the binary value of the decimal number 1263?
- A. 11010001111
- B. 10011101111
- C. 11011101101
- D. 10111101111
- E. 10011101011
Correct Answer: B 🗳️
Explanation: Only visible for ExamTorrent members. You can sign-up / login (it's free).
What is the command sequence to force a Cisco Nexus 6000 switch to boot using the golden BIOS image?
- A. Press Ctrl-Shift-6 within 2 seconds of when power is supplied to the switch.
- B. Press Ctrl-] within 30 seconds of when power is supplied to the switch.
- C. Press Ctrl-] within 2 seconds of when power is supplied to the switch.
- D. Press Ctrl-Shift-6 within 30 seconds of when power is supplied to the switch.
Correct Answer: A 🗳️
Viewing page 1 out of 42 pages.
Viewing questions 1-5 out of 210 questions.








