Study shouldn't wait for a desk. The BCS ISTQB Certified Tester Advanced Level: Test Automation Engineer online APP from ExamTorrent installs on all your devices — PC, tablet, phone — so 42 practice questions fit 2026 life anywhere, anytime.
BCS TAE Exam Overview:
| Certification Vendor: | BCS / ISTQB |
|---|---|
| Exam Name: | ISTQB Certified Tester Advanced Level: Test Automation Engineering (CTAL-TAE) |
| Exam Number: | TAE |
| Real Exam Qty: | 40 |
| Passing Score: | 43/66 |
| Available Languages: | English |
| Exam Duration: | 90 minutes |
| Related Certifications: | ISTQB Certified Tester Foundation Level (CTFL) CTAL-TAE ISTQB Certified Tester Advanced Level (CTAL) |
| Exam Format: | Multiple Choice |
| Sample Questions: | ![]() |
| Exam Way: | Available through accredited ISTQB exam providers, including Pearson VUE-based and online remote proctored delivery depending on the national board or provider. |
| Pre Condition: | Candidates must hold the ISTQB Certified Tester Foundation Level (CTFL) certificate before taking the CTAL-TAE examination. |
| Official Syllabus URL: | https://www.bcs.org/qualifications-and-certifications/certifications-for-professionals/software-testing-certifications/istqb-certified-tester-advanced-level-test-automation-engineering/ |
BCS TAE Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Test Automation Reporting and Metrics | - Reporting Mechanisms - Dashboards and Visualization - Metrics Analysis - Data Collection |
| Preparing for Test Automation | - Assessment of Automation Needs - Automation Feasibility Analysis - Testability Considerations - Selection of Automation Tools |
| Transitioning Manual Testing to an Automated Environment | - Migration Strategies - Selection of Test Cases for Automation - Test Script Development - Maintenance Planning |
| Generic Test Automation Architecture | - Automation Framework Design - Integration with Development Processes - Architecture Components - Test Execution Infrastructure |
| Deployment Risks and Contingencies | - Risk Identification - Mitigation Strategies - Maintenance Challenges - Contingency Planning |
| Continuous Improvement | - Process Optimization - Automation Solution Evolution - Lessons Learned and Feedback |
| Verifying the Test Automation Solution | - Review and Assessment Techniques - Validation of Automation Assets - Quality Assurance of Automated Tests |
| Introduction and Objectives for Test Automation | - Success Factors in Test Automation - Purpose of Test Automation |
What Candidates Ask About the BCS TAE Exam
The BCS ISTQB Certified Tester Advanced Level: Test Automation Engineer blueprint spans 8 domains — including Test Automation Reporting and Metrics, Introduction and Objectives for Test Automation, Verifying the Test Automation Solution. Spend your hours where the percentages are; the full outline above lists every subtopic.
90 minutes for 40 questions. Train the pace, don't guess it: the ExamTorrent software and online engines simulate the real test scene and score your performance, so exam day holds no surprises.
Candidates must hold the ISTQB Certified Tester Foundation Level (CTFL) certificate before taking the CTAL-TAE examination. Vendors adjust eligibility rules over time — verify the current requirements on the official page (official TAE exam page) before registering.
Files first: payment triggers an automatic email within a minute — download on unlimited devices, and contact our round-the-clock team if nothing arrives within 2 hours (check spam). Failure is covered: take the corresponding TAE exam within 60 days of purchase, and if you don't pass, email a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam — we handle it quickly, with the full refund processed within 7 days. Exclusions: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products. You may instead exchange for two equal-value products free.
Yes — download the free BCS ISTQB Certified Tester Advanced Level: Test Automation Engineer demo and inspect real questions before paying. Your purchase then stays valid for 365 days with free updates throughout, renewable afterward at 50% off.
The BCS ISTQB Certified Tester Advanced Level: Test Automation Engineer is BCS's official exam for the BCS Certification certification, at the Advanced level. It validates practical, job-relevant skills — which is why employers shortlist certified candidates. Related credentials include ISTQB Certified Tester Foundation Level (CTFL), ISTQB Certified Tester Advanced Level (CTAL), CTAL-TAE.
BCS ISTQB Certified Tester Advanced Level: Test Automation Engineer Sample Questions:
You have been asked to determine a TAS for a new release of a SUT,test should be automated wherever. The new release will consist of 5 new interfaces and an amendment to 3 existing interfaces. The new and amended interface will be deliver incrementally in 3 sprints, each lasting 2 weeks.
What would be the BEST Test Automation Solution (TAS) design in this scenario?
- A. Automate a test at once level, component level, Create customized interface/test hooks for this level where the interface has not yet been developed or amended.
- B. Automate the tests at two levels, Component and System level. Create customized hooks at Component level for interface not yet developed or amended. Only use the newly developed or amended interfaces to test at System level.
- C. Automate tests at both Component and System Level. Only do this automation once every interface has been fully developed or amended and manual testing has completed successfully.
- D. Automate tests at one level only, System level. Use only the newly developed interfaces and do not create any customized interfaces/test hooks.
Correct Answer: C 🗳️
You are reviewing the testability of your SUT.
Which of the following BEST refers to the characteristic of OBSERVABILITY?
- A. The ability of the SUT to prevent unauthorized access to its components or data.
- B. The ability to exercise the SUT by entering inputs, triggering events and invoking methods
- C. The abilityto identify states, outputs, intermediate result and error messages in the SUT
- D. The ability of the SUTto perform its intended function for a specified period of time
Correct Answer: C 🗳️
You are executing the first test run of a test automation suite of 200 tests. All the relevant information related to the state of the SUT and to the automated test execution is stored in a small database. During the Automated test run you observe that the first 10 test pass, while an abnormal termination occurs when executing the
11thtest. This test does not complete its execution and the overall execution of the suite is aborted. An immediate analysis of the abnormal termination is expected to be time consuming and you have been asked to produce a detailed report of the execution results for the first test run, as soon as possible.
What is the MOST important FIRST step to be taken immediately afterthe abnormal occurred when executing the 11thtest?
- A. Re-run the test automation suite starting from the 1sttest.
- B. Return the database to a consistent state that allows subsequent test to run
- C. Re-run the test automation suite starting from the 12thtest
- D. Take a backup of the database in its current state. So It can be analyzed later
Correct Answer: D 🗳️
Which of the following statements BEST describe aspects of the SUT to consider when designing a TAA?
- A. All the external test interfaces of the SUT should be removed prior to the product release
- B. All the internal test interfaces of the SUT should be removed prior to the product release
- C. All the interaction between SUT and TAS should belogged with the highest level of detail
- D. All the interface of the SUT affected by the tests should be controllable by the TAA
Correct Answer: C 🗳️
A project consists of distributed teams working in a 24-hour environment, where activities happen at all hours of the day. This project adopts a CI (Continuous Integration) process when developer check-in code and consists of automated activities that include generating a build and deploying it to a test environment.
Automated integration tests are run multiple times a day. The project have asked for a report containing the automation test results for every build, which must be available 24/7 to the project team.
Which of the following would be the BEST way to automatically provides this report?
- A. Store the execution results of the integration tests for the last build to adatabase (without overwriting the results from the previous builds), use this database to automatically update a dashboard containing the build history and test results accessible to the project team.
- B. Store the code coverage results of the integration tests for the last build to a database (without overwriting the results from the previous builds). And automatically create a chart showing the trend in code coverage and send via email to the project team.
- C. Store the execution result of the integration testsfor the last build to a database (overwriting the results from the previous build), automatically create a test execution report for this build send It via e-mail to the project team
- D. Store the execution results of the integration tests for the last build to a database (without overwriting the results from the previous builds). Automatically create a test execution report for this build and send it via e-mail to the project team
Correct Answer: A 🗳️








