AACE International CCP Exam Overview:
| Certification Vendor: | AACE International |
|---|---|
| Exam Name: | Certified Cost Professional (CCP) Exam |
| Exam Number: | CCP |
| Related Certifications: | EVP (Earned Value Professional) PSP (Planning & Scheduling Professional) PRMP (Project Risk Management Professional) CCT (Certified Cost Technician) CEP (Certified Estimating Professional) |
| Available Languages: | English |
| Exam Price: | See official site (varies by region & membership) |
| Real Exam Qty: | 119 multiple-choice + 1 written memo |
| Exam Duration: | 300 minutes |
| Passing Score: | 70% overall average |
| Certificate Validity Period: | 3 years |
| Exam Format: | Multiple-choice, Written memo assignment |
| Sample Questions: | ![]() |
| Exam Way: | Computer-based testing at authorized centers or online proctoring |
| Pre Condition: | Minimum 8 years of industry-related experience, OR 4 years of related experience plus a four-year degree |
| Official Syllabus URL: | https://web.aacei.org/certification/certifications-offered/professional-certifications |
AACE International CCP Exam Syllabus Topics:
| Section | Objectives |
|---|---|
| Topic 1: Interfacing with Other Disciplines | - Risk management basics - Quality management fundamentals - Scheduling and planning integration |
| Topic 2: Performance Analysis | - Earned value metrics - Progress measurement - Variance analysis |
| Topic 3: Cost Management | - Cost estimating and forecasting - Economic evaluation and analysis - Basic cost engineering principles |
| Topic 4: Communication Competency | - Written memo preparation |
CCP Exam FAQ — Run for It
The AACE International Certified Cost Professional (CCP) blueprint spans 4 domains — including Performance Analysis, Interfacing with Other Disciplines, Communication Competency. The complete outline above lists every subtopic; work them from heaviest to lightest.
See official site (varies by region & membership) per attempt, 70% overall average to pass. Retakes cost the full fee — act now and prepare properly with the 189 practice questions for the CCP exam at ExamTorrent.
Yes — download the free AACE International Certified Cost Professional (CCP) demo and preview the quality before paying. Purchases include 365 days of free updates by email; renew afterward at 50% off.
Minimum 8 years of industry-related experience, OR 4 years of related experience plus a four-year degree Eligibility rules change over time, so verify the current requirements on the official page (official CCP exam page) before registering.
300 minutes for 119 multiple-choice + 1 written memo questions. The ExamTorrent SOFT version — most proximate to the real exam in style and mode — builds the pacing you need on any Windows computer.
Upon successful payment, our system emails the AACE International Certified Cost Professional (CCP) vce torrent automatically within about a minute — apply it on any computer with no limitation, with 24/7 help if nothing arrives within 2 hours. If you fail the corresponding CCP exam within 60 days of purchase, we refund the full amount: send a scanned enrollment slip plus the official Score Report PDF within 2 days of the exam, processed within 7 days. Excluded: exams within 3 days of purchase, candidate names that don't match the payer, and free or expired products. Or exchange for two equal-value products free.
The AACE International Certified Cost Professional (CCP) is AACE International's certification exam for AACE Certification, at the Professional level. A compelling certification highlights you — from common to standout. Related credentials include CCT (Certified Cost Technician), CEP (Certified Estimating Professional), EVP (Earned Value Professional), PSP (Planning & Scheduling Professional), PRMP (Project Risk Management Professional).
AACE International Certified Cost Professional (CCP) Sample Questions:
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
The project scheduler left the company and has left unfinished work. You have been hired as the new project scheduler and must update the existing schedule. What will be your first task?
- A. Update the remaining duration for each activity
- B. Recalculate the critical path
- C. Recalculate the early start for each activity
- D. Recalculate the early finish for each activity
Correct Answer: A 🗳️
Explanation: Only visible for ExamTorrent members. You can sign-up / login (it's free).
A used concrete pumping truck can be purchased for $125,000. The operation costs are expected to be $65,000 the first year and increase 5% each year thereafter. As a result of the purchase, the company will see an increase in income of $100,000 the first year and 5% more each subsequent year. The company uses straight-line depreciation. The truck will have a useful life of five (5) years and no salvage value. Management would like to see a 10% return on any investment. The company's tax rate is 28%.
The compound interest factor used to determine Present Value in year number 5 is:
- A. 1.6051
- B. 0.3790
- C. 0.6209
- D. 0.6830
Correct Answer: C 🗳️
Explanation: Only visible for ExamTorrent members. You can sign-up / login (it's free).
A major theme park is expanding the existing facility over a five-year period. The design phase will be completed one year after the contract is awarded. Major engineering drawings will be finalized two years after the design contract is awarded and construction will begin three years after the award of the design contract. New, unique ride technology will be used and an estimate will need to be developed to identify these costs that have no historical data.
A cyclical process model was chosen as the basis for total cost management (TCM) because:
- A. Refinement is needed to prepare the estimate at completion (EAC)
- B. It is one of the basic tenets of quality improvement
- C. It facilitates development of budgets and schedules
- D. Strategic assets and projects have inherent life cycles
Correct Answer: D 🗳️
Explanation: Only visible for ExamTorrent members. You can sign-up / login (it's free).
A breach of contract can only occur when which of the following conditions is (are) present?
1. The item must be contrary to the intent of the parties
2. The item must be contrary to the contract terms and conditions
3. The injured party must actually sustain additional or excess costs
- A. Items 2 and 3
- B. Item 2
- C. Items 1 and 2
- D. Item 1, 2 and 3
Correct Answer: C 🗳️
Explanation: Only visible for ExamTorrent members. You can sign-up / login (it's free).
After collecting the control information on a light rail project within an original budget of 200.000 work hours, the construction contractor is ready for their monthly progress meeting with the client.
A total of 100.000 work hours have boon scheduled to date. with 105.000 work hours earned, and 110.000 work hours paid. The stated progress by the contractor Is 60%.
What is a method for figuring estimate at completion (EAC)?
- A. BCWS + (BAG -ACWP)
- B. ACWP + (BAC - BCWP)
- C. ACWP + (BAC - BCWS)
- D. BCWP + (BAG - ACWP)
Correct Answer: B 🗳️
Explanation: Only visible for ExamTorrent members. You can sign-up / login (it's free).
Viewing page 1 out of 38 pages.
Viewing questions 1-5 out of 189 questions.